We specified and installed the following equipment to the University of Bath’s on Campus TV Studio. The bespoke truss allowed for additional lighting fixtures for which the installation of local power supply was installed along with additional data panels and cable.
Twin studio rail curtain tracks were also installed along with white cyc filled cloth drapes and Chroma key cyc curtains and a 35 meter Rosco Chroma key floor.
In summary:
•Truss structure - free standing table top
•Studio rail , duel continuous loop
•Chroma key drapes and white cyclorama cloths
•Chroma key floor
•Facilities panels for local small power, BNC and data connections
•In addition we supplied and fitted black out blind and, loose grip equipment.